Concur Is Currently Unavailable

Jonathan Cox • May 22, 2025

Until the integration between CMiC and Concur is fully up and running, Keeley’ns should continue to not use Concur. While Concur is unavailable, please do not code or submit any expenses. Once the integration is ready, Keeley’ns will be submitting April and May expenses together in the same report as we get caught up from the blackout period. We expect the integration to be ready by the end of the month.

 

Once in Concur, you’ll note that the coding has been changed to now match CMiC:

  • There is no longer an ‘Extra’ field.
  • Work orders will now be added to the Job #.
  • Equipment numbers will have an extra “0” (ex: TK-400 is now TK-0400).

 

Please continue to stay out of Concur until you receive the green light that the integration is up and running and that the system is ready for use. You can reach out to the Accounting Team with any questions.

January 27, 2026
1.0 – Definition 2.0 – Policy 2.1 – Time & Material Projects 2.2 – Lump Sum Projects 3.0 – Mailing Instructions and Address Information 1.0 – Definitions Any surplus construction materials or structural components that are deemed to be scrap, that can be collected and taken to a recycling facility for compensation. Any used and or removed construction materials or structural components that are taken out during demolition that can be collected and taken to a recycling facility for compensation. 2.0 – Policy It is the general policy of Keeley to act with honesty and integrity when accounting for surplus and scrap materials. At no time shall materials be willfully and purposely recycled. Scrap materials are the property of the client or the company and should be treated as such. 2.1 – Time & Material Projects On a Time & Material (T&M) project the client owns all scrap materials when the materials have been originally purchased by them. In this case it is the client’s sole responsibility to collect (or provide a collection receptacle), transport, and collect any applicable compensation. Should the Client turn the scrap materials over to Keeley a written notice of this action is required before taking ownership of the materials. In this case, please refer to section 2.2. 2.2 – Lump Sum Projects On a lump sum project where the original construction materials are purchased by the company, Keeley owns all of the scrap materials that may arise. In this case care shall be taken to collect all scrap materials throughout the construction process. The items shall then be transported to a recycling facility that will pay out the compensation in form of a check. This check shall be made payable to Keeley Construction. This check shall then be promptly mailed to the Ewing Keeley office. 3.0 – Mailing Instructions Please send the scrap compensation checks in the US Mail or via UPS to the following address. After mailing the check please follow up with an email to jridler@keeleyconstruction.com with any tracking information and to let him know to be on the lookout. Keeley Construction Attn: Josh Ridler 500 S Ewing Ave Unit G St. Louis, MO 63103
January 27, 2026
Let’s be honest, going “fully green” overnight isn’t realistic for most of us. That’s okay. Sustainability isn’t about perfection. Small, consistent changes can make a real impact, especially when they are habits you’ll stick with. Here are a few simple ways to be more eco-friendly without overhauling your life. 1. Cut back on single use items This one is low effort, but high impact. Keep reusable water bottles, coffee mug, or a set of utensils on hand. Fewer disposables equal less waste in landfills. 2. Be intentional with energy use Turning off the lights when you leave a room, or unplugging chargers when your not using them seems like minor usage, but these add up. Open the blinds instead of flipping the switch, your plants will thank you. 3. Choose digital when you can Opt for digital documents, invoices, and notes instead of printed ones. When printing is necessary, use double-sided printing. It’s a simple way to reduce paper waste, especially in an office environment. 4. Support sustainable choices (when possible) You don’t have to buy all “green” everything. Just be more mindful. Choose durable products over disposable ones, and support companies that prioritize sustainability when it makes sense for you. 5. Talk about it One of the most overlooked green habits is conversation. Sharing tips, tricks, and wins with others helps normalize eco-conscious choices and encourages others to try them. Sustainability is about progress, not perfection. Start with one or two habits that feel manageable and build from there. Remember, real change takes time.
September 24, 2025
For those of you who haven’t heard yet, we are rolling out a new platform, GCPay, to help us manage lien waivers and subcontractor pay applications. GCPay will integrate seamlessly with CMiC to streamline workflows for our Finance & Accounting team, as well as improve processes for project teams as it relates to subcontractor bills & communication. Take a look at the information below so you are fully informed about how the GCPay rollout will impact you!